Upgrade at the Great Belt
In connection with the replacement of the instrumentation on the west bridge of the Great Belt link (Storebæltsforbindelsen), the last tilt sensors have just been installed and put into operation at all 62 pillars on …
In connection with the replacement of the instrumentation on the west bridge of the Great Belt link (Storebæltsforbindelsen), the last tilt sensors have just been installed and put into operation at all 62 pillars on …